-
DX1-24
When using unit DU2 with the additional module DX automatic starts and stops of engines are possible.
Module DX receives, for instance, the external start signal from a voltage supervision unit that notices an undervoltage. After reaching the rated voltage a again, the engine is stopped automatically.
At any time, module DX can easily be retrofitted for such automatic starts
For more information please contact :
PT. SINAR ELEKTRINDO PERKASA
Phone : (+62) 21 580 6044-45
Whatsapp : (+62) 857 7950 9308
Email : sep_seg@yahoo.com
Rp9.240.000Rp10.500.00012% offDX1-24
Rp9.240.000Rp10.500.00012% off -
BL10-12/24-3P
The charging set serves to recharge batteries rapidly and with less damage to the batteries, to maintain the fully charged state of lead nickel cadmium batteries and to cover the power requirement of continuous loads.
For more information please contact :
PT. SINAR ELEKTRINDO PERKASA
Phone : (+62) 21 580 6044-45
Whatsapp : (+62) 857 7950 9308
Email : sep_seg@yahoo.com
Rp6.993.000Rp10.500.000BL10-12/24-3P
Rp6.993.000Rp10.500.000 -
BI1-230-5
• Selective over and under current protection relay for electric machines, lines and networks
• Load dependent connection and disconnection of consumers and electric power generators in load shedding schemes
Function
The unit BI1 is equipped with an independent over (I>) and undercurrent supervision (I<) with seperate adjustable pickup values and trip delays. The measured current is continuously compared with the set reference values.
If the current exceeds or drops below the set value the relay trips after the time delay has elapsed.
Undercurrent supervision can be deactivated by turning potentiometer I</In to 0 %.For more information please contact :
PT. SINAR ELEKTRINDO PERKASA
Phone : (+62) 21 580 6044-45
Whatsapp : (+62) 857 7950 9308
Email : sep_seg@yahoo.com
Rp5.661.000Rp8.500.000BI1-230-5
Rp5.661.000Rp8.500.000 -
BU1-DC2-24
Function
Unit BU1-DC2 is equipped with an over (U>) and under voltage supervision (U<) with separate adjustable pick up values and common trip delay (t) and hysteresis (DIFF).The DC voltage measured is constantly compared with the set reference values. Any voltage signal, which exceeds the set reference value for over voltage, or falls below the set reference value for under voltage, will cause the respective relay to trip after elaps of the time delay.
For more information please contact :
PT. SINAR ELEKTRINDO PERKASA
Phone : (+62) 21 580 6044-45
Whatsapp : (+62) 857 7950 9308
Email : sep_seg@yahoo.com
Rp5.217.000Rp7.000.000BU1-DC2-24
Rp5.217.000Rp7.000.000 -
BL5-12/24-1P
The charging set serves to recharge batteries rapidly and with less damage to the batteries, to maintain the fully charged state of lead nickel cadmium batteries and to cover the power requirement of continuous loads.
For more information please contact :
PT. SINAR ELEKTRINDO PERKASA
Phone : (+62) 21 580 6044-45
Whatsapp : (+62) 857 7950 9308
Email : sep_seg@yahoo.com
Rp4.861.800Rp7.300.000BL5-12/24-1P
Rp4.861.800Rp7.300.000 -
GS-165, 6000/5A, 30VA, CL.10P10
TECHNICAL DATA
Case Type : Coated Resin
Color : Brown
Standard : IEC 61869-2
Primary Voltage : 0.7 / 3 kV
Frequency : 50 / 60 Hz
Secondary Current : …/5A, …/1A Available open request
Primary Current (A) : 5000, 6000Dimension : 310(w) x 70(h)
Max Busbar Dimension : 1 x (160×10) mm or 4 x (120×10) mm
Max Cable Diameter : 165 mmFor more information please contact :
PT. SINAR ELEKTRINDO PERKASA
Phone : (+62) 21 580 6044-45
Whatsapp : (+62) 857 7950 9308
Email : sep_seg@yahoo.com
Rp4.795.200Rp7.200.000GS-165, 6000/5A, 30VA, CL.10P10
Rp4.795.200Rp7.200.000 -
GS-165, 6000/5A, 60VA, CL.10P4
TECHNICAL DATA
Case Type : Coated Resin
Color : Brown
Standard : IEC 61869-2
Primary Voltage : 0.7 / 3 kV
Frequency : 50 / 60 Hz
Secondary Current : …/5A, …/1A Available open request
Primary Current (A) : 5000, 6000Dimension : 310(w) x 70(h)
Max Busbar Dimension : 1 x (160×10) mm or 4 x (120×10) mm
Max Cable Diameter : 165 mmFor more information please contact :
PT. SINAR ELEKTRINDO PERKASA
Phone : (+62) 21 580 6044-45
Whatsapp : (+62) 857 7950 9308
Email : sep_seg@yahoo.com
Rp4.795.200Rp7.200.000GS-165, 6000/5A, 60VA, CL.10P4
Rp4.795.200Rp7.200.000 -
BU1-AC-400 VAC
BU1-AC AC Voltage Relay
Application
Over and under voltage supervision of 1 and 3 phase systems.
Function
Unit BU1-AC is eguipped with an independent over {U>) and under voltage supervision {U<) with separate adjustable pickup values and common trip delay {t) and hysteresis {DIFF). The voltages are compared with the set reference values.
For three phase over voltage supervision the highest voltage in each phase is evaluated, for under voltage supervision the lowest in each phase.
Pickup of supervision circuit U> or U< is indicated by flashing of the corresponding LED.
At U< tripping LED U< extinguishes, at U> tripping. LED U> is steady lit.
At voltages < 60 % Un no trip delay takes place.
For more information please contact :
PT. SINAR ELEKTRINDO PERKASA
Phone : (+62) 21 580 6044-45
Whatsapp : (+62) 857 7950 9308
Email : sep_seg@yahoo.com
Rp4.795.200Rp7.200.000BU1-AC-400 VAC
Rp4.795.200Rp7.200.000 -
BP1-R-230
Application
Reverse Power detection of genset in parallel.
Function
The unit BP1-R is equipped with a reverse power supervision {PR>} with infinitely adjustable pickup value and time delay.
The reverse power measured is constantly compared with the set reference values. If the reverse power exceeds the set reference value the relay trips after of the times delay has elapsed.
The relay functions will be activated from 70% Un.
For more information please contact :
PT. SINAR ELEKTRINDO PERKASA
Phone : (+62) 21 580 6044-45
Whatsapp : (+62) 857 7950 9308
Email : sep_seg@yahoo.com
Rp4.662.000Rp7.000.000BP1-R-230
Rp4.662.000Rp7.000.000 -
SY1-110-50
The synchronizer unit SY1 is supplied from one phase of each system. The unit compares the two frequencies, the difference in voltage and measures the phase coincidence and gives led impulse to close the alternator circuit breaker.
Application
This unit is normally used for switching on Parallel generating sets with either the mains supply or with other generating sets
Synchronizing unit SY1 is monitoring these values angives an output impulse, when they are within theipre-set limits
For more information please contact :
PT. SINAR ELEKTRINDO PERKASA
Phone : (+62) 21 580 6044-45
Whatsapp : (+62) 857 7950 9308
Email : sep_seg@yahoo.com
Rp4.662.000Rp7.000.000SY1-110-50
Rp4.662.000Rp7.000.000 -
SY/SP N-230-50
Unit SY/SP N is used to prevent wrong synchronization of Alternators at manual operation e.g. by unskilled personnel.
To prevent high current and mechanical stresses at paralleling the following conditions must be fulfilled before switching in parallel:• Voltage difference
• Frequency difference
• Phase angle must be inside limitsSynchronizing check relay SY/SP N monitors these values and provides closure of contact 4 – 12 if these are inside preset limits.
For more information please contact :
PT. SINAR ELEKTRINDO PERKASA
Phone : (+62) 21 580 6044-45
Whatsapp : (+62) 857 7950 9308
Email : sep_seg@yahoo.com
Rp4.662.000Rp7.000.000SY/SP N-230-50
Rp4.662.000Rp7.000.000 -
IWK N 2-3
Current Sensing are given an output contact when the current flow rise above the pread justed limit. The time lag between measuring the over current and giving the output contact is independent on the percentage of over current. Independent current relays are normaly used for selective triping. The other current relays are operating dependent on percentage of overcurrent, like thermal or inverse current relay.
Function and Adjustment
Independent current relay IWU N and IWK N consisting of: one electronic current measuring circuit (resp. 3 circuits withindex IW. 2/3) as well as one lag circuit for the switching delay. A led indicates the position of the adjusted limit.
For more information please contact :
PT. SINAR ELEKTRINDO PERKASA
Phone : (+62) 21 580 6044-45
Whatsapp : (+62) 857 7950 9308
Email : sep_seg@yahoo.com
Rp4.662.000Rp7.000.000IWK N 2-3
Rp4.662.000Rp7.000.000